| DCS-URD1 | "The ATLAS DCS User Document" | H. J. Burckhart | (
in ps ), 22 November 1995 |
| DCS-IWN1 | "Proposals on ATLAS' DCS software development" | V. Filimonov, V.
Khomoutnikov,
Yu. Ryabov, ATLAS Internal Note DAQ-NO-043 |
(in ps) 27 Feb 1995 |
| DCS-IWN2 | "Current View on ATLAS DCS Databases" | V. Filimonov, V. Khomoutnikov, Yu. Ryabov | (in ps) 27 May 1997 |
| DCS-IWN3 | "A Prototype Application for Evaluating EPICS and CAN Bus", | H. J. Burckhart, D. Fernández Carreiras, M. González Bergés , H. Milcent, D.R. Myers, ATLAS Internal Note DAQ-NO-080 | (in
html) , or in (in
ps ). June 1997 |
| DCS-IWN4 | "ATLAS DCS Configuration Database: Current State and General Problems for Discussion" | V. Khomoutnikov, Yu. Ryabov | (
in ps format ) 5 December 1997 |
| DCS-IWN5 | "Performance Measurments of the ATLAS Local Monitor Box with the Liquid Argon Subdetector" | B. Hallgren and H. J. Burckhart | (in
pdf) 457 kbytes 23 October 1998 |
| DCS-IWN6 | "Magnetic field and temperature tests of the ATLAS Local Monitor Box " | V. Filimonov and B.Hallgren | (
in pdf) 81 kbytes 3 December 1998 |
| DCS-IWN7 | "Review of the Local Monitor Box (LMB)" | H.J.Burckhart and B.Hallgren | (
in pdf) 27kbytes 26 October 1999 |
| DCS-IWN8 | "Connection DCS <==> DAQ in ATLAS" | H.J.Burckhart, M.Caprini and R.Jones | (
in pdf ) 29 kbytes 12 November 1999 |
| Out of series | "Front-end Read-out via CAN for ATLAS DCS" | H.J.Burckhart and B.Hallgren | (
in pdf) 256 kbytes 31 Januray 2000 |
| DCS-IWN9 | "Irradiation Measurements of the ATLAS ELMB" | H.J.Burckhart, B.Hallgren and H.Kvedalen | (
in pdf ) 55 kbytes 8 March 2001 |
| DCS-IWN10 | "Radiation tests at GIF and accelerated aging tests of the ELMB" | J.Cook, B.Hallgren and H.Kvedalen | (
in pdf ) 540 kbytes 2 May 2001 |
| DCS-IWN11 | "Radiation test of the 3.3V version ELMB at GIF" | B. Hallgren and H. Kvedalen | (
in pdf ) 993 kbytes 31 August 2001 |
| DCS-IWN12 | "'Single Event Effect Test of the Embedded Local Monitor Board" | H. Boterenbrood,
H.J. Burckhart,
B. Hallgren, H. Kvedalen and N. Roussel |
(
in pdf ) 452 kbytes 20 September 2001 |
| DCS-IWN13 | "ELMB Full Branch Test: Behaviour and Performance" | F.Varela Rodriguez, J. Cook, V. Filimonov, B.Hallgren | (in
pdf ) 369 kbytes 27 November 2001 |
| DCS-IWN14 | "Non Ionising Energy Loss Test of the Embedded Local Monitor Board " | J.Cook and B.Hallgren | (
in pdf ) 211 kbytes 21January 2002 |
| DCS-IWN15 | "TID radiation test at GIF of the ELMB with the ATmega128L processor" | J.Cook and B.Hallgren | (in pdf
) 178
kbytes 19 April 2002 |
| DCS-IWN16 | "Results of radiation tests of the ELMB (ATmega128L) at the CERN TCC2 area" | H. Boterenbrood, H.J. Burckhart, J.Cook, V. Filimonov, B. Hallgren and F.Varela-Rodriguez | (in
pdf )
913 kbytes 26 Sept 2002 |
| DCS-IWN17 | "Systems of ELMB buses using the Kvaser PCI CAN card" | F.Varela Rodriguez | (in
pdf
) 132 kbytes 19 Sept 2002 |
| DCS-IWN18 | "Exporting Internal PVSS Databases" | N.Gaspar, A. Amorim, C.Oliveira, L.Pedro | (in pdf
) 116
kbytes 21 March 2002 |
| DCS-IWN19 | "Results from Neutron Irradiations of the ELMB128" | B.Hallgren | (in pdf) 236 kbytes 29 September 2003 |
| DCS-IWN20 | "SEE and TID Tests of the Embedded Local Monitor Board with the ATMEGA128 processor" | H. Boterenbrood and B. Hallgren | (in pdf) 532 kbytes 29 September 2003 |
| DCS-IWN21 |
"NIEL Qualification of the
ELMB128 Series Production" |
H. Boterenbrood and B. Hallgren | (in pdf)
569 kbytes 18 February 2004 |
| DCS-IWN22 |
"Interaction DAQ Run Control - DCS" |
ATLAS Run Control and DCS Teams | (in doc)
47 kbytes 25 May 2004 |
| DCS-IWN23 | "SEE and TID Qualification of the ELMB128 Series Production" | H. Boterenbrood and B. Hallgren | (in pdf) 300 kbytes 15 November 2004 |