CERN
Home Page
ATLAS
Home Page
Technical
Organization
Detector construction liaison ATLAS Test Beam

ATLAS Test Beam Schedule

(ATLAS at SPS H8/H6/GIF)


2003 (Draft)

 
  2003  
     
 
Version 10 (13/06/2003) - Based on Draft 1.4 of SPS

 
Excel format
pdf format
palm pdb format
     
  Beam request sent to SPS coordinator  
     
  2002  
     
 
Version 8 (30/5/2002) - According to SPS schedule DRAFT 1.4

 
Excel format
pdf format
palm pdb format
     
  Beam settings for the 2002 period (pdf)  
     
  2001  
     
 
Version 2 (25/07/2001)
Last update after internal arrangements Pixel/SCT and EMEC/HEC
 
Word format
pdf format
palm pdb format
     
 
Beam settings: p1a.pdf, p1b.pdf, p1c.pdf, p2a.pdf, p2b.pdf, p2c.pdf
 
     
 
Machine Development periods in 2001
 
     
 
The 25 ns period.
 
     


Creation: 010527, by BDG Last update 030206 by BDG
schedule schedule