Alignment system home
page
The ATLAS Alignment System PDR (17/03/2001)
ATLAS chambers positioning and alignment installation(24/04/2006)
Minutes of the Alignment
meetings (<2001)
Barrel Alignment
- General documents
- General description, subsytems and specifications for positioning tolerances (14/03/01),
(pdf)
- Layout and implementation of the alignment sensors on all chamber types (sketches, 16/11/2004)
- BIL_BIS standard sector (sectors 1-2) (09/11/04)
(ppt)
- BIS_BIL_BIS sectors 8-9-10 (14/04/05)
(ppt)
- BIL_BIS sectors 13-14 (10/11/04)
(ppt)
- BIM-BIR-BIS sectors 11-12 (25/11/04)
(ppt)
- BIS-BIM-BIR sectors 14-15 (16/11/2004)
(ppt)
- BIM-BIR-BIS sectors 15-16 (16/11/04)
(ppt)
- BML-BMS standard sector (sectors 1-2) (09/07/04)
(ppt)
- BML-BMS sectors 7-8 (09/07/04)
(ppt)
- BMF-BML-BMF sectors 12-13-14 (26/07/04)
(ppt)
- BML-BMF sectors 13-14-15 (26/07/04)
(ppt)
- BOL-BOS standard sector (sectors 1-2) (02/08/04)
(ppt)
- BOL-BOF-BOG sectors 11-12-13 (09/07/04)
(ppt)
- BOL-BOF-BOG sectors 13-14-15 (09/07/04)
(ppt)
- The full set of all drawings (14/04/05)
(ppt)
|
|
- Engineering drawings
- Labeling, cabling, DAQ...
- Barrel alignment DAQ scheme and cables specs, (04/02)
(ppt)
- Multiplexing scheme RasMux-MasterMux-USAMux in ATLAS (6 PC solution), (05/10/04)
(ppt)
- Multiplexing scheme RasMux-MasterMux-USAMux in ATLAS (8 PC solution), (05/09/05)
(ppt)
- Tables of the cabling scheme for RasMux-MasterMux, (08/10/04)
(xls)
- Labeling and cabling scheme on Rasmux, (26/04/06)
(ppt)
- RASMUX cabling tables for all chambers (not complete, in progress), (17/09/03)
(xls)
- Naming conventions for barrel RASNIK lines, (26/04/05)
(ppt)
- Connection scheme between TopMux, MasterMux and Rasmux in ATLAS (6 PC solution), (26/04/05)
(ppt)
- Connection scheme between TopMux, MasterMux and Rasmux in ATLAS (8 PC solution), (11/04/06)
(ppt)
- Tables of all barrel optical lines with the corresponding TopMux/MasterMux/RasMux channels, (12/09/05)
(Florian page)
- Geometry parameters and calibration constants for all subsystems, (26/10/05)
(ppt)
- DataBase
- Database of all barrel lines (channels, installation status, TIF images...)
(Andrea's database)
- DCS cabling scheme
- Sketches of the DCS cabling routing ELMB->y-junction box, (18/05/06)
(ppt)
- Tables of the DCS cabling scheme ELMB->y-junction box, (18/05/06)
(xls)
- Tables of short DCS cable lengthes, (07/12/05)
(xls)
- Cabling scheme for B sensors, (25/10/05)
(ppt)
- Barrel platform positioning
- Positioning tolerance for Praxial and projective plateforms
(ps)
- Procedure for praxial platform positioning during MDT assembly
(ppt)
- H8 barrel setup
- PS drawings of the H8 alignment setup and results (19/07/04)
(list)
- RASMUX cabling tables for H8 2004 chambers, (14/05/04)
(xls)
- Survey results for the 2003 setup (survey of 22/07/2003) (19/07/04)
(txt)
- Survey results for the 2004 setup (survey of 22/06/2004) (19/07/04)
(txt)
End Cap Alignment
Alignment with tracks
- Alignment with hight pt tracks during data taking
(ppt)
The opto-electronical sensors
Initial chamber positioning tolerances in the ATLAS muon spectrometer
- Constraints from the measurement precision and alignment sensor ranges
(ps)
Programs
- The alignment reconstruction software
(ps)
- OO/C++ barrel alignment reconstruction: ASAP program (ATLAS Spectrometer Alignment Program)
(Asap Web site)
- End cap alignment reconstruction: ARAMYS program
(Aramys Web site)
- In-plane alignment reconstruction
(text)
C.Guyot (Last update: 26/04/2006)