File: AAA.readme ---------------- this directory : /afs/cern.ch/atlas/project/TIE/detector/Tile_calorimeter/ATLLE contains the reference drawings for the tilecal calorimeter extended barrel. In order to transfer data, FTP to the CERN machine : asisftp.cern.ch login : anonymous passw : "you E-mail adress" directory : cd /dist/expts/atlas/TIE/detector/Tile_calorimeter/reference/ATLLE if you are already on afs: cd /afs/cern.ch/atlas/project/TIE/detector/Tile_calorimeter/reference/ATLLE and the copy to your home directory For more information please contact Marzio Nessi, email: marzio.nessi@cern.ch Drawings history: ===================== ===================== DATE DRAWING# Comment --------- ------------ ------------------------ 03-10-96 all release on this disk of the new drawing versions. All drawings are now posted for comments up to the 15-10-96. These drawings are not approved for construction yet Marzio Nessi-CERN PPE 05-11-96 all drawings , but ATLLESM_001 and ATLLEE_002 all drawings a part the one mentioned have been updated in agreement on the comments received. ATLLESM_001 has still some technical problem related to some missing information. ATLLEE_002 will be influenced by a new proposal related to the connection of the plug module. It will be released together with the plug details All other drawings are ready for construction They are still marqued as not valid for construction This will deisappear as soon we apply the new standard procedure for accepting drawings. It will take still at least 1 week to finallyse this operation. The IGS files have some problem, some symbols are missing, we are investigating! Marzio Nessi-CERN PPE 08-11-96 changes in the drawing ATLLESK_001 and ATLLES_002 , going to cycle C. An error in the size and tol. of the location pins has been corrected (after L.Miralles comments) 16-12-96 changes in the girder drawings (tollerance quotation) ATLLEG__001 and ATLLEGB_001 going to cycle C. (after ANL comments) problem with ATLLESM_001 fixed internal endplate drawing changed to the new idea of the ITC The new drawing is ATLLEE__003 New set of drawings for the ITC submodule after agreement with UTA. Marzio Nessi-CERN PPE