Barrel Pre-assembly done
Link to barrel underground assembly
|
ONLINE camera_view_of the_pre-assembly
|
Each part of the Tile calorimeter (the barrel and 2 extended barrel wheels)
will be pre-assembled in build. 185 before the detector
will be put into the ATLAS pit. The aim is to test and certify in the surface
all the technical aspects related with this activity,
e.g. the tooling, supports, observe cylinder deformations, confirmation of the
shims calculated to put between modules,etc.
Cylinder |
Preassembly Start-end date (detailed schedule) |
Assembly in the pit start-end (Schedule_V6) |
Project Progress tracking (ppt) |
EBC |
21 Oct. 02 - 14 Jun. 03 | Oct 04 - Feb 05 | (link)
|
Barrel |
May 04 - Oct 04 | . | |
EBA |
May. 04 - Sept 04 | May 05 - Sep 05 | . |
.
Useful Links:
X.Andresen & A. Henriques last update 25/05/2004