Tile Calorimeter Detector Unit

                ATLAS Tilecal Pre-Assembly

Barrel Pre-assembly done

 

Link to barrel underground assembly

 

ONLINE camera_view_of the_pre-assembly 
 
 

old_camera_pictures:
yymmdd_hhmmss.jpg

Each part of the Tile calorimeter (the barrel and 2 extended barrel wheels) will be pre-assembled in build. 185 before the detector
will be put into the ATLAS pit. The aim is to test and certify in the surface all the technical aspects related with this activity,
e.g. the tooling, supports, observe cylinder deformations, confirmation of the shims calculated to put between modules,etc.

Preassembly schedule:

 Cylinder

Preassembly
Start-end date
(detailed schedule)
 Assembly
 in the pit
 start-end
(Schedule_V6)
Project Progress 
tracking 
(ppt)

EBC
Assembly
+ Disassembly

21 Oct. 02 - 14 Jun. 03 Oct 04 - Feb 05

(link)
(need  cern afs user password)

Barrel
Assembly
+ Disassembly

   01 Jul. 03 - 12 Feb. 04

May 04 - Oct 04  .

EBA

May. 04 - Sept 04 May 05 - Sep 05 .

.
 

Useful Links:  


http://atlas.web.cern.ch/Atlas/SUB_DETECTORS/TILE/line1.gif

X.Andresen  & A. Henriques last update 25/05/2004