date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
# At each Quality Control step a report is required in the logbook.. The signature of the designed QC person is required. Instrumentation start date:
|
|
|
|
|
|
|
|
|
|
|
|
| 1. Module Preparation | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 1.0 | Record Module Number & Site | . | . | . | |||||||||
| 1.1 | Set-up Module | . | . | . | |||||||||
| 1.2 | Set-up Work Space and Supplies | . | . | . | |||||||||
| 1.3 | QC0:
Initial Inspection |
. | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 1.3a) Residual Glue, paint, contaminants | . | . | |||||||||||
| 1.3b) Spring Pins | . | . | |||||||||||
|
1.3c) Plate/Weld Bar Edges |
. | . | |||||||||||
| 1.3d) Sub module Shims and Spacing | . | . | |||||||||||
| 1.3e) Painted Surfaces | . | . | |||||||||||
| 1.3f) Slot Widths | . | . | |||||||||||
| 1.3g) Overall dimensions | . | . | |||||||||||
| 1.3h) Check that the girder screws have the correct tension (~200 Newton) | . | . | |||||||||||
| 1.4 | Clean and paint Module Surfaces | . | . | . | |||||||||
| 1.5 | Close girder holes with aluminium tape | . | . | . | |||||||||
| 1.6 | Install Fiber Fixation Rails
+ Pieces for Bundle Fiber Fixation |
. | . | . | |||||||||
| 1.7 | Record Aspirin Tube Batch # | . | . |
. |
|||||||||
| 1.8 | Install Aspirin Tubes and washers | . | . | . | |||||||||
| 1.9 | Mark Cell Boundarie Label holes with cell numbers paint with colors separation between cells | . | . | . | |||||||||
| 2. Tile Installation | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 2.1 | QC1a:
Tile Inspection |
. | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 2.1a) Tile Color | . | . | |||||||||||
| 2.1b) Tile End Surfaces | . | . | |||||||||||
| 2.1c) Tile Wrappers | . | . | |||||||||||
| 2.2 | Record Tile Batch and pack Numbers | . | . | . | |||||||||
| Tile Size | Packs ID | Comments | |||||||||||
| 1 | . | . | |||||||||||
| 2 | . | . | |||||||||||
| 3 | . | . | |||||||||||
| 4 | . | . | |||||||||||
| 5 | . | . | |||||||||||
| 6 | . | . | |||||||||||
| 7 | . | . | |||||||||||
| 8 | . | . | |||||||||||
| 9 | . | . | |||||||||||
| 10 | . | . | |||||||||||
| 11 | . | . | |||||||||||
| 2.4 | Insert Tiles | . | . | . | |||||||||
| 2.5 | QC1b:
Tile Inspection after insertion |
. | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 2.5a) Tile Sizes | . | . | |||||||||||
| 2.5b) Tile End Surfaces | . | . | |||||||||||
| 2.5c) Tile Wrappers | . | . | |||||||||||
| 2.6 | Put Shims where it was needed | . | . | . | |||||||||
| 2.7 | Install and close rods | . | . | . | |||||||||
| 3. Routing Preparations | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 3.1 | Record ITC Fiber serial
#
(EB only) |
. | . | . | |||||||||
| 3.2 | Install ITC Fiber Assemblies
(EB's Only) |
. | . | . | |||||||||
| 3.3 | Record Laser Fiber Bundle IDs | . | . | . | |||||||||
| 3.4 | Install Laser Fiber Bundles | . | . | . | |||||||||
| 3.5 | Install Fiber Separator wires | . | . | . | |||||||||
| 4. Fiber/Profile Installation | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 4.1 | Record profiles/fibers Batch #s | . | . | . | |||||||||
| 4.2 | Fill table with profile boxes | . | . | . | |||||||||
| 4.3 | Insert Profiles/fibers | . | . | . | |||||||||
| 4.4 | QC2:
Verify Fiber Lengths and Sorting using LED tubes |
. | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 4.4a) Fiber Lengths | . | . | |||||||||||
| 4.4b) Fiber Counts | . | . | |||||||||||
| 4.4c) Depth Sorting | . | . | |||||||||||
| 4.4d) Bad tile/fiber coupling or bad fibers | . | . | |||||||||||
| 4.5 | Verify that profiles are well inside gaps | . | . | . | |||||||||
| 5. Fiber Pre-Routing | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 5.1 | Count fibers inside and ajust fibre extremities | . | . | . | |||||||||
| 5.2 | Route Sub-bundles To Aspirin Tubes | . | . | . | |||||||||
| 5.3 | Remove fibre separator strings | . | . | . | |||||||||
| 5.4 | Remove one rod from each tile size | . | . | . | |||||||||
| 5.5 | Introduce the LED/light tubes | . | . | . | |||||||||
| 5.6 | QC3:
Verify Fiber Routing |
. | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 5.6a) Routing mistakes | . | . | |||||||||||
| 5.6b) Bad tile/fibre coupling | . | . | |||||||||||
| 5.6c) Profiles coming out of the grooves | . | . | |||||||||||
| 5.7 | Register and secure Fibers in aspirine tubes | . | . | . | |||||||||
| 5.8 | QC4:
Fiber Registraton and Damage |
. | . | . | |||||||||
| Item | OK | Not OK : List problems and repairs | |||||||||||
| 5.8a) Stress Crazing | . | . | |||||||||||
| 5.8b) Cladding Damage | . | . | |||||||||||
| 5.8c) Fiber Curvature | . | . | |||||||||||
| 5.8d) Fibers outside girder | . | . | |||||||||||
| 5.9 | Secure the sub-bundles with velcro straps and adjust ends | . | . | . | |||||||||
| 5.10 | Insert the dummy fibres | . | . | . | |||||||||
| 6. Glue fiber bundles | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 6.1 | Prepare glue | . | . | . | |||||||||
| 6.2 | Verify again fibre extremities | . | . | . | |||||||||
| 6.3 | Glue | . | . | . | |||||||||
| 6.4 | Reserve Samples of Epoxy | . | . | . | |||||||||
| 6.5 | Wait for Epoxy Cure | . | . | . | |||||||||
| 7. Final routing | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 7.1 | Cut dummy fibers extremities | . | . | . | |||||||||
| 7.2 | Tie Fiber Bundles to Rails | . | . | . | |||||||||
| 7.3 | Put cotton cable | . | . | . | |||||||||
|
7.4 |
Put scotch aluminium | . | . | . | |||||||||
| 8. Polish Fiber Ends | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 8.1 | Set-up the Polishing Machine | . | . | . | |||||||||
| 8.2 | Polish Fibers | . | . | . | |||||||||
| 8.4 | Remove Polishing Machine | . | . | . | |||||||||
| 8.3 | Clean the girder | . | . | . | |||||||||
| 8.5 | QC5: Inspect Fiber Ends | . | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 8.5a) Check for dust inside the girder | . | . | |||||||||||
| 8.5b) Fiber End Surface Quality | . | . | |||||||||||
| 8.5c) Visual Light Level with video camera | . | . | |||||||||||
| 9. Install
Source Tubes
(This task will be done at CERN for all modules.) |
|||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 9.1 | QC7a:
Check Source tube holes |
. | . | . | |||||||||
| 9.2 | Measure module length | . | . | . | |||||||||
| 9.3 | Cut straight tubes | . | . | . | |||||||||
| 9.4 | Prepare tube ends | . | . | . | |||||||||
| 9.5 | Clean tubes | . | . | . | |||||||||
| 9.6 | QC7b:Test with Dummy capsule | . | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| Straight Tubes | . | . | |||||||||||
| Bent Tubes | . | . | |||||||||||
| 9.7 | Glue pairs of straight tubes to make 'U's | . | . | . | |||||||||
| 9.8 | Passing test of 'U' s with dummy capsule | . | . | . | |||||||||
| 9.9 | Insert 'U's | . | . | . | |||||||||
| 9.10 | Glue the rest of bent tubes | . | . | . | |||||||||
| 9.11 | Intermediate passing test of glued parts of pipe system | . | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 9.12 | QC7a: Final passing test of pipe system with dummy capsule | . | . | . | |||||||||
| 9.13 | QC7b: Final pressure test | . | . | . | |||||||||
| Sub Item | OK | Not OK : List problems and repairs | |||||||||||
| 10. Close up | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 10.1 | Cover Module with Light Tight 'Paper' | . | . | . | |||||||||
| 10.2 | Attach Girder End Plates | . | . | . | |||||||||
| 11. Cleanup | |||||||||||||
| Task | Description | Date | Operators | Comments | |||||||||
| 11.1 | Remove Assembly Fixture | . | . | . | |||||||||
| 11.2 | Remove Supplies and Tools | . | . | . | |||||||||
|
11.3 |
Bring module to storage room | . | . | . | |||||||||
| 12. Test & Certification (QC6) | ||||||||||||||
| Task | Description | Date | Operators | Comments | ||||||||||
| 12.1 | Insert Test Drawer | . | . | . | ||||||||||
| 12.2 | Install Source & Driver | . | . | . | ||||||||||
| 12.3 | Connect Power and
Signal Cables |
. | . | . | ||||||||||
| 12.4 | Record Source Scan
for Each Tile Layer |
. | . | . | ||||||||||
| 12.5 | Verify that the Data is Good | . | . | . | ||||||||||
| 12.6 | Remove &
Store Source & Driver |
. | . | . | ||||||||||
| 12.7 | Remove &
Store Test Drawer |
. | . | . | ||||||||||
| 12.8 | Update Production
Monitor Pages |
. | . | . | ||||||||||
This page maintained by: - RJM